Home>News > Company NewsThe basic steps of water park construction
Firstly, the conceptual design planning phase
1. Selected a theme
2. Story lines
3. Thematic image
4. Equipment list
5. Layers of floor layout
6. Overall aerial view
7. Outer packing style of euipment
Secondly, equipment selection stage
1 According to the concept of design, confirm the equipment provided list
2 Determine the production period of each device.
3 Determine the location and basic drawings of each device, floor space,
4 Signed procurement contracts and pay the advance payment
Thirdly, the program design
1 This stage design start after identified rides, equipment selection, detailed technical drawings, related operating models and specific functional requirements of each region Indicators
2 Floor plans
3 Tourists Moving, transportation and escape route.
4 Outer packaging design
5 landscape design with functional facilities
6 Environmental art and scene design Landscape style
8 lighting system design
Fourthly, Construction Design and Floor construction Stage
Fivethly, equipment installation and commission phase
Sixthly, Operations Team Recruiting Stage
Seventhly, operating team training phase
Eighthly, test operation phase
Ninethly, Opening Ceremony